Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Final link of Woolston-Burwood Expressway

26 June 2002


Final link of Woolston-Burwood Expressway to be constructed soon.

A final link in Christchurch’s eastern ring road, from Eureka Street to Birch Street, is about to be constructed, completing the expressway corridor from Main North Road (at St Bedes College) to Dyers Road.

On completion of the expressway, Transit New Zealand proposes to relocate State Highway 74 to the eastern ring road. Currently State Highway 74 provides access to the Port of Lyttleton from the north of Christchurch through the central city area.

The first stage of the Woolston-Burwood Expressway (from Travis Road to Eureka Street) was completed in two parts during 2000 and 2001.

Contractors Isaac Construction Ltd will begin work on the final stage in July, with construction expected to take eleven to thirteen months. It will be constructed in two sections, firstly north of Pages Road towards Wainoni Road, and then south of Pages Road towards Birch Street.

The project involves the construction of a two-lane road, with a shared cycle/pedestrian pathway on the south side adjacent to the road. The existing roundabout at the intersection of Pages Road and Bexley Road will be removed and the entrance to each side of Bexley Road narrowed to emphasise the residential nature of the street. A new traffic signal-controlled intersection will be installed where the expressway intersects with Pages Road.

The permanent closures of Eureka Street, Carisbrooke Street, Bexley Road (north and south), Brook Street and Birch Street have been legally processed as part of the project. The contractor will ensure that residents are notified of when the physical closures are to take place.

Additional features of the work will include a new park-like area to the south of Eureka Street on the riverside of the new expressway (opposite Carisbrooke St). It will be planted with shrubs and specimen trees. The vertical riverbank will be regraded to slope gently to the water’s edge providing river access via an informal beach. Other improvements will help towards reducing the effects of flooding which has always been a problem in this low lying area of the city.

While the work is being undertaken, the construction site will not be accessible to the public, resulting in the probable blockage of some existing informal walking routes, particularly from Farnborough Reserve through the currently empty road corridor to Pages Road.

Christchurch City Council and Transit New Zealand have jointly funded all stages of the expressway.


Release ends

© Scoop Media

 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

Gordon Campbell: On The New Pike River Agency (And The Air Strike Wing)

Much of the sympathy the public still feels for the families of the Pike River miners has been sustained by the sense that the previous government – let alone the mining company and the processes of receivership and litigation – has never dealt honestly, or fairly, with them.

Finally, yesterday’s announcement by the Ardern government that a new state agency will be set up to assess and plan the manned re-entry to the mine (on a set timetable) goes a long way to meeting the families’ remaining request: that they be enabled, if at all possible, to bury their loved ones. More>>

 

Foreign Affairs: Patrick Gower Interviews Jacinda Ardern

Prime Minister Jacinda Ardern says discussions have already begun on how to bring climate change refugees into New Zealand under a Pacific seasonal employment plan... More>>

ALSO:

Gordon Campbell: On The Centre Right’s Love Of ‘Nanny State’

You’d almost think it was 2005 again. That was a time when the rugged individualists of the centre-right were being beset by government regulations on the nature of light-bulbs, the size of shower heads, the junk food available at school tuck shops and other such essentials... More>>

Speaking Of Transport: Public Engagement On Wellington Scenarios

“Our work on possible solutions for Wellington’s transport future is ongoing, but has progressed to the stage where we’re ready to share our ideas with the public and seek their feedback to help guide our next steps...” More>>

ALSO:

Parental Leave: National's Time-Sharing Change Fails

National has proposed a change to the Parental Leave and Employment Protection Amendment Bill that would allow both parents to take paid parental leave at the same time, if that is what suits them best. More>>

ALSO:

Train Free Thursday: Workers Strike To Defend Terms Of Employment

"They signed up to these conditions a year ago when they got the contract for Wellington's rail services. Now they're trying to increase profits by squeezing frontline workers." More>>

ALSO:

Seclusion: Ombudsman Emphasises Importance Of Monitoring

Disability Rights Commissioner Paula Tesoriero says that while there have been changes to the Education (Update) Amendment Act 2017 to prohibit the use of seclusion, the report is an important reminder of the importance of regular monitoring of schools. More>>

ALSO:

 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

Featured InfoPages

Opening the Election