Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 


Investigation into Electric Trains to Pukekohe

20 November 2012

Investigation into Electric Trains to Pukekohe

Another step towards world-class public transport infrastructure across Auckland

Auckland Transport is looking at options for an extension of the electrification of the rail network as far south as Pukekohe. Previously it was only intended to electrify the lines to Papakura.

The proposal is to look at options, including funding, for electrification to Pukekohe. This would see trains running from Pukekohe to Britomart every 20 minutes at peak times and every 30 minutes at other times.

Mayor Len Brown has welcomed the investigation saying it would mean people in Franklin would be able to enjoy the full benefits of the electrification of the rail network, our new electric trains and the City Rail Link along with the rest of Auckland.

"This would mean quieter, faster and more efficient trains all the way to Pukekohe. This is another example of us working to ensure people across the region enjoy the benefits of a united Auckland.”

Mr Brown says “Pukekohe is identified in the Auckland Plan as a key regional centre for future residential and business growth, which will have a rapidly growing need to move people to and from homes and jobs in the area.”

Auckland Transport says significant population growth between Drury and Pukekohe makes the electrification viable. The area’s population is predicted to more than treble in the next 30 years to close to 80,000.

Franklin Local Board chairman Andy Baker says “This is something we have been advocating for and the community has been wanting for a long time. We are extremely pleased that the investigation is happening now as it makes sense to do the work while we have contractors and systems in place to build Auckland’s electric rail network. “

Electrification to Pukekohe is estimated to cost $102.3m. Close to $19m has already been set aside in Auckland Transport’s Long Term Plan. The project would see new Park and Ride facilities and stations at Paerata and Drury and a major station upgrade at Pukekohe, the purchase of two additional 3-car EMUs, the raising of three bridges and track lowering at one location.

There will be a net saving of $2m per year if the diesel engines to Pukekohe are replaced with electric ones.

A fleet of 57 three-car electric train sets is currently being built by Spanish firm Construcciones y Auxiliar de Ferrocarriles (CAF), suppliers of electric trains and light rail fleets to a large percentage of European markets and metropolitan customers around the world.

Auckland’s new electric trains have been designed to meet the specific needs of those travelling around Auckland and feature the latest state-of-the-art technology in terms of safety, comfort and reliability. The first electric train is due to arrive in Auckland in the third quarter of 2013 and will undergo significant testing before going into public service in 2014.

ENDS

© Scoop Media

 
 
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

 

PARLIAMENT TODAY:

Rebuild Rebrand: "Regenerate Christchurch" To Replace CERA

The regeneration of Christchurch will be the city’s focus for the next five years as local leadership progressively takes control of the rebuild, Canterbury Earthquake Recovery Minister Gerry Brownlee says. More>>

ALSO:

Nauru: Scholars Urge Minister To Act On Deteriorating Democracy

“Since the 2013 election in Nauru, there has been a series of disturbing developments on the islands that indicate a severe deterioration in the state of its parliamentary democracy and in the rule of law,” say the scholars. More>>

ALSO:

Foreign Affairs: NZ Begins Presidency Of UN Security Council

Prime Minister John Key has welcomed the start of New Zealand’s month-long Presidency of the United Nations Security Council in New York. More>>

ALSO:


Labour: Cash For Charter Schools, Mould For State Schools

“Recently released financial statements show the Whangarei charter school He Puna Marama received $3.9 million in government funding to the end of last year. Yet their audited accounts show they only spent $1.4 million on education, leaving almost $2.5 million over two years unaccounted for." More>>

ALSO:

Kiwirail Plans Shift From Electric: National Urged Not To Take Backwards Step

The National Government shouldn’t drag New Zealand backwards by replacing its climate friendly electric trains with carbon-polluting diesel trains, the Green Party said today. More>>

ALSO:

Capital Connection:

Harmful Digital Communication Bill Passes: Focus Must Be On Education

InternetNZ acknowledges the passage of the Harmful Digital Communications Bill into law this afternoon, and says that the sooner the education efforts at the heart of the legislation start, the better... More>>

ALSO:

3-Year Transport Plan: No Plans On Six Northland-Election Bridges

The Transport Authority’s decision to fund only four of the 10 bridges promised in National’s shameless Northland by-election bribe is a huge embarrassment for Transport Minister Simon Bridges, Labour’s Transport spokesperson Phil Twyford says. More>>

ALSO:

Gaza Blockade: Māori TV Crew Returning Safely From Israel

A Māori Television crew will be flown back from Israel after their boat was detained by the Israeli Navy while attempting to break the Gaza blockade. More>>

ALSO:

Get More From Scoop

 

LATEST HEADLINES

 
 
 
 
 
 
 
 
 
Regional
Search Scoop  
 
 
Powered by Vodafone
NZ independent news