Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 


Prime Minister starts final Western Ring Route project

16 May 2014

Prime Minister starts final Western Ring Route project

The final project linked to the NZ Transport Agency’s huge expansion of Auckland’s Northwestern Motorway (State Highway 16) was officially launched today by the Prime Minister, John Key.

Mr Key turned the first spade of soil marking the start of construction on the SH16 St Lukes to Great North Road Upgrade – a project to widen 2 kilometres of SH16, and upgrade the St Lukes overbridge spanning the motorway.

Also present at the ground breaking ceremony were Auckland’s deputy mayor, Penny Hulse, elders from Ngati Whatua O Orakei and Te Kawerau a Maki and community and transport leaders.

The Transport Agency’s acting Highway Manager, Steve Mutton, says the upgrade is the last of six critical projects to ensure motorways and local roads are ready for the increased volume of traffic when the Waterview tunnels connecting the Northwestern and Southwestern (SH20) motorways are completed in early 2017.

“The opening of the tunnels and connecting two busy motorways will have as big an impact on the way people travel around and through the city as the Auckland Harbour Bridge did 55 years ago when traffic started crossing it for the first time.”

Mr Mutton says little time will be lost starting work on the $70m project. Enabling works begin this Sunday night (18 May), and at the end of the month there will be 5 overnight closures that will have a significant impact on drivers using the Northwestern Motorway.

“This project may be small compared with its $1.4b neighbour just down the motorway at the Waterview tunnels, but the improvements are essential part of our programme to make the Northwestern Motorway and local roads better,” he says.

The SH16 St Lukes to Great North Road Upgrade, delivered by Leighton Contractors, will widen the motorway from three to four lanes in each direction, and improve motorway ramps. As part of the project, Auckland Transport will fund improvements at the St Lukes Road-Great North Road intersection, and widen the St Lukes Road overbridge to benefit drivers, walkers and cyclists.

Deputy Mayor Penny Hulse describes the project as another milestone in providing transport choices for Aucklanders.

“It’s important we provide an integrated transport network with options including bus, train and ferry as well as cycling and walking to keep Auckland moving, and that’s an integral part of this project”, says Cr Hulse. “This upgrade will play a significant role in improving links between the west and the rest of Auckland and as a local councillor that is particularly welcome.”

St Lukes is the last of six projects to connect the Northwestern and Southwestern motorways and complete the Western Ring Route (WRR) – identified by the Government as one of its Roads of National Significance to help improve the economy and road safety.

The other projects are New Zealand’s largest-ever roading project – the Waterview Connection and construction of its twin tunnels and a motorway-to-motorway interchange, the Causeway Upgrade Project, and improvements to the Te Atatu and Lincoln Road interchanges on the Northwestern. Re-construction of the Maioro Street interchange (SH20) has been completed.

There are two other works linked to the WRR. The first of a series of projects to better connect the northern end – the Upper Harbour Highway (SH18) at Albany – with the Northern Motorway (SH1) began in January, and options are being investigated to improve the Royal Road interchange on the Northwestern Motorway.

The Western Ring Route will provide a 47km-long alternative to SH1 between Albany and Manukau. It will provide more reliable city connections – particularly with developing commercial and residential areas in the northwest and southwest – and improve regional transport connections for people and freight.

“Today’s ground breaking event marks a symbolic ‘begninng of the end’ for those projects linked directly to the Waterview tunnels, but we are undertaking more improvements to our network to make it better for city and regional drivers,” Mr Mutton says.

For more information please visit www.nzta.govt.nz

ENDS

© Scoop Media

 
 
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

Patience: Drive Safe

Be patient before passing is the AA's message for drivers this Labour weekend.

"People taking crazy risks to get past other vehicles is one of the most dangerous things on the road,” says AA spokesperson Dylan Thomsen.

“The weather is looking good for the long weekend so the roads will be busy. Unfortunately, that also increases the chances of people getting frustrated and trying a risky passing manoeuvre. When they get past, there will probably be more traffic up ahead anyway so it won’t get people there faster.” More>>

 
 

Parliament Today:

Employment Relations Bill: Govt Strains To Get Tea Break Law Through

The Government has been left with egg on its face - failing to get its much-vaunted, but hugely unpopular, meal break law passed in the first week of its new term, Labour spokesperson on Labour Issues Andrew Little says. More>>

ALSO:

Guns: Police Association Call To Arm Police Full Time

"The new minister gave his view, that Police do not need to be armed, while standing on the forecourt of parliament. The dark irony was that the interview followed immediately after breaking news of a gunman running amok in the Canadian parliament in Ottawa..." More>>

ALSO:

Gordon Campbell: On The Tokenism Of New Zealand's Role Against Islamic State

Our contribution against IS will be to send SAS forces to train the Iraqis? That’s like offering trainers to General Custer just as the 7th cavalry reached the Little Big Horn. More>>

ALSO:

Scoop Business: Shell And Todd Caught Drilling Without Approval

Multi-national oil company Shell’s New Zealand arm and local energy giant Todd Energy have breached the new law governing New Zealand’s Exclusive Economic Zone, the Environmental Protection Authority says in an Oct. 10 document released by the Green Party. More>>

ALSO:

Gordon Campbell: On Pharmac, Gough Whitlam And Sleater-Kinney

We’re not at the outset of these negotiations. The outset was six years ago, and negotiators were hoping to have some sort of ‘framework’ deal finished in time for the APEC meeting in a few weeks’ time. These ‘extreme’ positions are what we’ve reached near the intended end of the negotiations… More>>

ALSO:

PM Of Many Hats: Questions, No Answers On Whale Oil

Dr RUSSEL NORMAN (Co-Leader – Green) to the Prime Minister: How many times since November 2008 has he spoken with blogger Cameron Slater on the phone and how many times, if any, has he texted him?
Rt Hon JOHN KEY (Prime Minister): None in my capacity as Prime Minister. More>>

ALSO:

Aussie Investigation Dropped: Call On Minister McCully To Pursue The Case Of Balibo Five

West Papua Action is deeply concerned at the lack of any clear outcome from the Australian Federal Police inquiry into the 1975 deaths of the ‘Balibo Five’ including NZ journalist Gary Cunningham. More>>

ALSO:

'Feed The Kids' Bill: Metiria Turei To Lead Fight On Feeding Hungry Children

Green Party Co-leader Metiria Turei is urging all political parties to support the Feed the Kids Bill which she inherited today from Mana leader Hone Harawira. More>>

ALSO:

Parliament Today: State Opening Of Parliament

The House sat at 10.30am on Tuesday before MPs were summoned to hear the Speech from the Throne in the Legislative Council Chamber. More>>

ALSO:

Get More From Scoop

 

LATEST HEADLINES

 
 
 
 
 
 
 
 
Regional
Search Scoop  
 
 
Powered by Vodafone
NZ independent news