Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search


Design funding for new busway

Joint Media Release: 18 August 2014

Design funding for new busway
Funding has been approved to further develop plans for the South Eastern Busway from Panmure Station to Pakuranga.

The NZ Transport Agency has approved design funding of $20.9m, with it subsidising $11m, for the Panmure to Pakuranga section of the Auckland Manukau Eastern Transport Initiative (AMETI).

It will be the next stage after the current work in Panmure, which comprised the new Panmure Station and a new link road between Mt Wellington Highway and Morrin Rd.

Proposed Panmure to Pakuranga projects also include the Reeves Rd flyover in Pakuranga, replacing Panmure roundabout with an intersection with traffic lights, a second Panmure Bridge for the busway and a shared cycle/foot path.

Auckland Transport aims to begin construction in 2017, subject to approval of construction funding and consents.

Auckland Transport Chairman Dr Lester Levy says the popular Panmure Station and a new road, due to open soon, are just the start of major transport improvements for the area. “With the first stage in Panmure almost complete and delivering benefits already, we’re looking forward to the next stage. This funding will allow us to further develop the design of the busway and other major transport projects.

“Public transport is currently a poor option because buses get caught in the same congestion as cars, resulting in long travel times. Large numbers of passengers are expected to be attracted by quicker, frequent and more reliable buses on lanes separate to traffic.

“Buses will run every 5-10 minutes most of the day and travel times will be reliable. It will take about 27 minutes to get between Pakuranga and Britomart by bus and train, about 8 minutes quicker than currently. There will be bigger time savings when the busway is extended to Botany in the future. Together, the AMETI projects are aimed at improving people’s transport choices and better connecting the south eastern suburbs to each other and the rest of Auckland.”

The Transport Agency’s Regional Manager of Planning and Investment, Peter Casey, says support for Auckland projects like AMETI are a high priority for the Transport Agency. “AMETI ticks a lot of boxes for us in a very busy area of Auckland where there’s strong economic and population growth. Supporting Auckland Transport’s upgrades of a whole range of transport choices will improve safety, and make the time it takes to travel between destinations a lot more reliable for people.”

Mr Casey says the Transport Agency will contribute just over a 50% share of the total cost of AMETI – funding that comes from revenue gathered by the agency from the excise duty on fuel, road user charges and vehicle registration fees and is then reinvested in transport projects.

Auckland Transport will continue to consult with residents, businesses and the community in the project area before applying for a land designation in the second quarter of 2015. This would be followed by a publicly notified hearing.

Key facts
The Panmure to Pakuranga projects are the next stage of the $1.3 billion AMETI programme. The long term project features a busway from Panmure to Pakuranga and Botany, roading upgrades at bottlenecks in Panmure and Pakuranga, and new cycling and walking infrastructure.

The Panmure to Pakuranga projects include:
• Replacing Panmure roundabout with an intersection with traffic lights and more direct pedestrian crossings
• Panmure to Pakuranga busway on lanes separate to traffic congestion
• Panmure to Pakuranga shared cycle/foot path separate to traffic
• Direct connection from Pakuranga Rd to Pakuranga Highway via Reeves Rd
• Pakuranga bus station
• Second Panmure Bridge for busway and shared path.


Find out more at: https://at.govt.nz/projects-roadworks/ameti/

© Scoop Media

Parliament Headlines | Politics Headlines | Regional Headlines



Wellington.Scoop: Serco – First The Prisons, And Now It Wants To Run The Trains

As the government continues its inquiry into Serco’s discredited administration of Mt Eden prison in Auckland, here in Wellington there’s further scrutiny of the British outsourcing company – because it’s competing to take over the running of our commuter trains. More>>


Gordon Campbell: On The TPP Countdown, And Mary Margaret O’Hara

To date, the Key government has been unwilling to share any information about this TPP deal until it is too late for outraged public opinion to affect the outcome... the disclosure process is likely to consist of a similarly skewed and careful exercise in spin. More>>


Australia Deportations: English Relaxed On Immigration Centre Conditions

Labour's Annette King: “There have been numerous reports from inside these detention centres on just how bad conditions are... If they were being held in any other foreign jail, I imagine Mr English would be somewhat concerned. More>>


Schools: Achievement-Based Funding Would Be A Disaster

The Education Minister’s speech to the PPTA Conference raising the spectre of achievement data driving a new funding system would be disastrous, says NZEI Te Riu Roa. More>>

  • Video Out-Link - PPTA Annual Conference 2015 on Livestream (Q+A dicussion suggests funding would be directed to less successful schools.)

  • ALSO:

    ECE Report:

    Key In NY: Prime Minister Addresses United Nations

    Prime Minister John Key has addressed the United Nations General Assembly in New York, focusing on a call for action in Syria and on other conflicts, reform of the veto process and on the UN’s Sustainable Development Goals. More>>.


    Gordon Campbell: On The Lack Of Accountability Over Philip Smith

    In New Zealand, accountability is an exotic creature rarely glimpsed at ministerial level, or among senior management. The flight to Rio by the paedophile /murderer Philip John Smith/Traynor is no exception. More>>


    More On Corrections

    Get More From Scoop



    Search Scoop  
    Powered by Vodafone
    NZ independent news