Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search


Design funding for new busway

Joint Media Release: 18 August 2014

Design funding for new busway
Funding has been approved to further develop plans for the South Eastern Busway from Panmure Station to Pakuranga.

The NZ Transport Agency has approved design funding of $20.9m, with it subsidising $11m, for the Panmure to Pakuranga section of the Auckland Manukau Eastern Transport Initiative (AMETI).

It will be the next stage after the current work in Panmure, which comprised the new Panmure Station and a new link road between Mt Wellington Highway and Morrin Rd.

Proposed Panmure to Pakuranga projects also include the Reeves Rd flyover in Pakuranga, replacing Panmure roundabout with an intersection with traffic lights, a second Panmure Bridge for the busway and a shared cycle/foot path.

Auckland Transport aims to begin construction in 2017, subject to approval of construction funding and consents.

Auckland Transport Chairman Dr Lester Levy says the popular Panmure Station and a new road, due to open soon, are just the start of major transport improvements for the area. “With the first stage in Panmure almost complete and delivering benefits already, we’re looking forward to the next stage. This funding will allow us to further develop the design of the busway and other major transport projects.

“Public transport is currently a poor option because buses get caught in the same congestion as cars, resulting in long travel times. Large numbers of passengers are expected to be attracted by quicker, frequent and more reliable buses on lanes separate to traffic.

“Buses will run every 5-10 minutes most of the day and travel times will be reliable. It will take about 27 minutes to get between Pakuranga and Britomart by bus and train, about 8 minutes quicker than currently. There will be bigger time savings when the busway is extended to Botany in the future. Together, the AMETI projects are aimed at improving people’s transport choices and better connecting the south eastern suburbs to each other and the rest of Auckland.”

The Transport Agency’s Regional Manager of Planning and Investment, Peter Casey, says support for Auckland projects like AMETI are a high priority for the Transport Agency. “AMETI ticks a lot of boxes for us in a very busy area of Auckland where there’s strong economic and population growth. Supporting Auckland Transport’s upgrades of a whole range of transport choices will improve safety, and make the time it takes to travel between destinations a lot more reliable for people.”

Mr Casey says the Transport Agency will contribute just over a 50% share of the total cost of AMETI – funding that comes from revenue gathered by the agency from the excise duty on fuel, road user charges and vehicle registration fees and is then reinvested in transport projects.

Auckland Transport will continue to consult with residents, businesses and the community in the project area before applying for a land designation in the second quarter of 2015. This would be followed by a publicly notified hearing.

Key facts
The Panmure to Pakuranga projects are the next stage of the $1.3 billion AMETI programme. The long term project features a busway from Panmure to Pakuranga and Botany, roading upgrades at bottlenecks in Panmure and Pakuranga, and new cycling and walking infrastructure.

The Panmure to Pakuranga projects include:
• Replacing Panmure roundabout with an intersection with traffic lights and more direct pedestrian crossings
• Panmure to Pakuranga busway on lanes separate to traffic congestion
• Panmure to Pakuranga shared cycle/foot path separate to traffic
• Direct connection from Pakuranga Rd to Pakuranga Highway via Reeves Rd
• Pakuranga bus station
• Second Panmure Bridge for busway and shared path.


Find out more at: https://at.govt.nz/projects-roadworks/ameti/

© Scoop Media

Parliament Headlines | Politics Headlines | Regional Headlines


Minister of Finance: Plan Shows $100 Billion Infrastructure Projects

Finance Minister Bill English has today launched the Government’s Ten Year Capital Intentions Plan (CIP) which shows a pipeline of $100.9 billion worth of infrastructure projects over the next decade. More>>


Werewolf: Safe Landings Gordon Campbell on the safety challenge to the Wellington runway extension.

The safety-related legal challenge revolves around the size of the 90 metre long Runway End Safety Area (RESA) being proposed for the runway extension. More>>


Environment Commissioner: We Need To Work Together On Climate Change And Farming

“The debate around agricultural emissions and the ETS has been polarised for too long,” said the Commissioner. “But the ETS is not the only way forward – there are other things that can be done.” More>>


NZ Super Fund: Seeking To Put A Market Price On Climate Change

Oct. 19 (BusinessDesk) - The New Zealand Superannuation Fund says it will devise a set of rules to assess investment winners and losers under climate change, a strategy that could rule out fossil fuels or producers such as current portfolio member Exxon ... More>>


Rejuvenation: Parata Will Not Contest 2017 Election

Education Minister and National List MP Hekia Parata has today announced that she will not be contesting the next election. She advised the Prime Minister of her decision earlier this year. More>>

Prisons Grow: Government Approves Plans For Increased Prison Capacity

Despite significant progress in reducing crime the number of prisoners has increased faster than projected. This is because the proportion of offenders charged with serious crimes has risen, meaning more people are being remanded in custody and serving more of their sentences in prison. More>>


Gordon Campbell: On Plastic Bag Activism, And Street Harassment

Amusing to see the Act Party experiencing another outbreak of young fogey-ism. What has aroused the ire of Act Leader David Seymour this time is the introduction of a Greens private members bill to the ballot process, calling for a 15 cents levy on plastic bags to reduce pollution. More>>


Unclear Weapons: US Navy Ship Cleared To Visit NZ For Navy's 75th

United States Navy ship, the USS Sampson, has been given clearance to visit New Zealand next month by Prime Minister John Key... “The process for considering the visit by the USS Sampson is the same as that used for all ships attending the International Naval Review." More>>


Get More From Scoop



Search Scoop  
Powered by Vodafone
NZ independent news