Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 


Design funding for new busway

Joint Media Release: 18 August 2014

Design funding for new busway
Funding has been approved to further develop plans for the South Eastern Busway from Panmure Station to Pakuranga.

The NZ Transport Agency has approved design funding of $20.9m, with it subsidising $11m, for the Panmure to Pakuranga section of the Auckland Manukau Eastern Transport Initiative (AMETI).

It will be the next stage after the current work in Panmure, which comprised the new Panmure Station and a new link road between Mt Wellington Highway and Morrin Rd.

Proposed Panmure to Pakuranga projects also include the Reeves Rd flyover in Pakuranga, replacing Panmure roundabout with an intersection with traffic lights, a second Panmure Bridge for the busway and a shared cycle/foot path.

Auckland Transport aims to begin construction in 2017, subject to approval of construction funding and consents.

Auckland Transport Chairman Dr Lester Levy says the popular Panmure Station and a new road, due to open soon, are just the start of major transport improvements for the area. “With the first stage in Panmure almost complete and delivering benefits already, we’re looking forward to the next stage. This funding will allow us to further develop the design of the busway and other major transport projects.

“Public transport is currently a poor option because buses get caught in the same congestion as cars, resulting in long travel times. Large numbers of passengers are expected to be attracted by quicker, frequent and more reliable buses on lanes separate to traffic.

“Buses will run every 5-10 minutes most of the day and travel times will be reliable. It will take about 27 minutes to get between Pakuranga and Britomart by bus and train, about 8 minutes quicker than currently. There will be bigger time savings when the busway is extended to Botany in the future. Together, the AMETI projects are aimed at improving people’s transport choices and better connecting the south eastern suburbs to each other and the rest of Auckland.”

The Transport Agency’s Regional Manager of Planning and Investment, Peter Casey, says support for Auckland projects like AMETI are a high priority for the Transport Agency. “AMETI ticks a lot of boxes for us in a very busy area of Auckland where there’s strong economic and population growth. Supporting Auckland Transport’s upgrades of a whole range of transport choices will improve safety, and make the time it takes to travel between destinations a lot more reliable for people.”

Mr Casey says the Transport Agency will contribute just over a 50% share of the total cost of AMETI – funding that comes from revenue gathered by the agency from the excise duty on fuel, road user charges and vehicle registration fees and is then reinvested in transport projects.

Auckland Transport will continue to consult with residents, businesses and the community in the project area before applying for a land designation in the second quarter of 2015. This would be followed by a publicly notified hearing.

Key facts
The Panmure to Pakuranga projects are the next stage of the $1.3 billion AMETI programme. The long term project features a busway from Panmure to Pakuranga and Botany, roading upgrades at bottlenecks in Panmure and Pakuranga, and new cycling and walking infrastructure.

The Panmure to Pakuranga projects include:
• Replacing Panmure roundabout with an intersection with traffic lights and more direct pedestrian crossings
• Panmure to Pakuranga busway on lanes separate to traffic congestion
• Panmure to Pakuranga shared cycle/foot path separate to traffic
• Direct connection from Pakuranga Rd to Pakuranga Highway via Reeves Rd
• Pakuranga bus station
• Second Panmure Bridge for busway and shared path.

ENDS

Find out more at: https://at.govt.nz/projects-roadworks/ameti/

© Scoop Media

 
 
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

 

PARLIAMENT TODAY:

Midwives On Pay Equity: Historic Bill Of Rights Case For High Court

“We have been left with no choice.” That from Karen Guilliland, the Chief Executive of the New Zealand College of Midwives, as the organisation prepares to file a pay parity discrimination case on the basis of gender under the NZ Bill of Rights Act in the High Court. More>>

ALSO:

Gordon Campbell: On The Children’s Commission Report On CYF

Accusing the overworked and underfunded staff at Child, Youth and Family of a “dump and run culture of neglect” is the kind of luxury that a Children’s Commissioner can afford to indulge in from his own comfy perch in the bureaucracy. More>>

ALSO:

Mt Eden Prison: Serco Inquiry Extended

A two month delay to the Government investigation into prison fight clubs shows the extent of problems within the Serco circus, says Labour’s Corrections spokesperson Kelvin Davis. More>>

ALSO:

Health And Safety: Late Addition Of National Security Provisions A Concern

The New Zealand Law Society has expressed its significant concerns at the last-minute addition to the Health and Safety Reform Bill of provisions for a closed material procedure for court proceedings where national security is involved. More>>

ALSO:

Rugby And Beer: World Cup Alcohol Bill Passes

ACT MP David Seymour’s Sale and Supply of Alcohol (Extended licensing hours during Rugby World Cup) Bill completed its third reading by 99 to 21... More>>

ALSO:

Get More From Scoop

 

LATEST HEADLINES

 
 
 
 
 
 
 
 
 
Regional
Search Scoop  
 
 
Powered by Vodafone
NZ independent news