Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Dunedin drivers, be ready for work sites this Summer

MEDIA RELEASE

14 November 2017 | SOUTHERN REGION

Dunedin drivers, be ready for work sites north and south of Dunedin this summer

The NZ Transport Agency and its highway maintenance contract team for Coastal Otago, the Highway Highlanders, advise drivers that the summer highway maintenance period gets underway this month on the coastal Otago network. The majority of work is concentrated on State Highway 1 between Palmerston and Milton.

There will be:
• Asphalt resurfacing in the one-way system in Dunedin.
• Four area-wide treatment (road reconstructions, overlays) crews in Palmerston, Patmos Ave on the Dunedin Northern Motorway (see photo below), Balclutha and SH8 near Lawrence.
• There will be three crews completing flood repairs between Palmerston and Waihola in November.
• Three crews will be completing pavement maintenance on SH1 between Oamaru and Balclutha.
• Re-sealing is starting in November on SH83 between Kurow and Pukeuri and then SH1 between Oamaru and Balclutha.
• There will be bridge repairs at the Shag River Bridge on SH1 north of Palmerston which will require a stop/go operation at times and night work at the Beaumont Bridge later in November.
• As well as this maintenance of the existing highway network, there are three other major projects on-going on the network carried out by other contractors:

o Waikouaiti watermain renewal (Whitestone Contracting for Dunedin City Council)
o Dunedin’s one-way streets Cycleway (Fulton Hogan for the Transport Agency)
o Dunedin Southern Motorway Safety Improvements (Fulton Hogan for the Transport Agency)

“We advise road users to be patient at this busy time and allow extra time when travelling at peak times, especially between Palmerston and Milton,” says Graeme Hall, Transport Agency System Manager. “It is important to stick to the posted speed limits for the safety of our workers and other road users as there will be loose chip on the road following some of these operations.
“This work has to be done when temperatures are warmer for the best results. We know it can cause delays and we thank everyone for their patience heading into the summer road sealing season.”


© Scoop Media

 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

Supreme Court: Worksafe Decision On Whittall Pike River Prosecution Unlawful

The question in issue on the appeal was whether WorkSafe New Zealand acted to give effect to an unlawful agreement of this nature when it offered no evidence on charges against Peter William Whittall for breaches of the Health and Safety in Employment Act 1992...

The Supreme Court... has found that the decision to offer no evidence was made under an unlawful agreement to stifle prosecution. It has granted a declaration to that effect. More>>

 

Cullen To Chair: Tax Working Group Terms Of Reference Announced

Finance Minister Grant Robertson and Revenue Minister Stuart Nash today announced the Terms of Reference for the Tax Working Group and that the Group will be chaired by Sir Michael Cullen. More>>

ALSO:

Gordon Campbell: On The New Pike River Agency (And The Air Strike Wing)

Much of the sympathy the public still feels for the families of the Pike River miners has been sustained by the sense that the previous government – let alone the mining company and the processes of receivership and litigation – has never dealt honestly, or fairly, with them. More>>

ALSO:

Not Going Swimmingly: Contractor Cut, New Dates For Christchurch Sports Centre

“As an incoming Minister, I have been conducting a thorough review of progress on the Anchor projects and to learn of a $75 million budget blowout on this project was very disappointing..." More>>

ALSO:

Tertiary: Allowances, Loan Living Costs To Get Boost

“From 1 January, student allowance base rates and the maximum amount students can borrow for living costs will rise by a net $50 a week,” says Education Minister Chris Hipkins... further adjusted from 1 April 2018 in line with any increase in the CPI. More>>

ALSO:

Foreign Affairs: Patrick Gower Interviews Jacinda Ardern

Prime Minister Jacinda Ardern says discussions have already begun on how to bring climate change refugees into New Zealand under a Pacific seasonal employment plan... More>>

ALSO:

Gordon Campbell: On The Centre Right’s Love Of ‘Nanny State’

You’d almost think it was 2005 again. That was a time when the rugged individualists of the centre-right were being beset by government regulations on the nature of light-bulbs, the size of shower heads, the junk food available at school tuck shops and other such essentials... More>>

 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

Featured InfoPages

Opening the Election