Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Airfield expansion kicks off next phase of upgrade


Media Release | 21 May 2019

Airfield expansion kicks off next phase Auckland Airport’s major infrastructure build

Auckland Airport’s airfield expansion project marks the next critical phase of its multi-billion dollar infrastructure development programme designed to revitalise the airport over the next decade.

“This is the beginning of a series of truly transformational projects at Auckland Airport,” said André Lovatt, Auckland Airport’s general manager, airport development and delivery.

“The complete development programme of work we are embarking on will yield some really great benefits and enable us to accommodate the 40 million passengers and 260,000 flights that are expected by 2044.”

The airfield development is the first of eight major infrastructure projects Auckland Airport will commence over the next decade and follows the completion of major upgrades to the international terminal over the last four years.

Over the next three years, more than 250,000sqm of land or about 30 rugby pitches will be converted into new airfield space at the western end of the airport beside the international terminal. This will add more than 18 per cent surface area to the airfield.

This project is one of Auckland Airport’s single largest capital investments in the airfield since it was built in 1966. It will deliver an additional taxiway, extension of an existing taxiway and development of six remote stands for the parking and servicing of aircraft.

The taxiways will improve aircraft movement around the airfield and will eventually link between the current runway and the future second runway.

The remote stands will provide space for aircraft that layover for several hours before departing again and will have in-ground jet fuel reticulation.

Combined, these projects will provide some additional airfield capacity to allow the relocation of existing aircraft activities, when the development of the future domestic jet terminal takes place.

The new airfield will be built to specifications to accommodate the world’s largest passenger planes with a wingspan of 65m to 80m.

“Auckland Airport is working hard to grow New Zealand’s success in travel, trade and tourism, and this project is a critical piece of the puzzle in enabling our future masterplan,” said Mr Lovatt. “The remote stands are designed to give us some head room, so that one day they can become physically connected gates to the terminal, as growth in airline and passenger numbers demands it over time.”

Construction company CPB has been named as the preferred contractor for the project and earthworks are expected to begin mid-year and be completed by late 2021.

The eight anchor projects are the foundation of the overall programme of work Auckland Airport is undertaking to develop transport, airfield and terminal infrastructure.

They are:

- the taxiway and remote stand airfield development

- the second runway

- a new cargo facility

- a new international arrivals’ area

- rejuvenation of the current domestic terminal

- the new domestic jet terminal

- reconfiguration of the international forecourt drop-off and pick up facility

- further development of the road network north of the terminals

Other Key Facts:

One million cubic metres of earth will be moved (or the equivalent of 760 Olympic-sized swimming pools)
260,000 ton of imported aggregate will used for pavement construction
7,000 metres of new storm water drainage system will be installed
2,200 metres of new fuel reticulation pipeline will be required
The taxiways and remote stands will be built to Code F standard, which is required for the largest operating aircraft (greater than 65m wingspan) now and in the future
CPB Contractors is a CIMIC Group company with a business based in Auckland and working across New Zealand

ends

© Scoop Media

 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

PM In US: Christchurch Call Leaders’ Dialogue

In only four short months we have – collectively – made real strides toward both preventing and responding to the very real harm caused by terrorist and violent extremist content online.

I know colleagues will speak to the details of this announcement, so I will only note that the plan for a reshaped Global Internet Forum to Counter Terrorism (the GIFCT) is a substantial, meaningful commitment by industry.

This has been developed in conversation with partner governments and civil society, in the spirit of collaboration of the Christchurch Call. More>>

 

Minister's Speech: Arms Legislation Bill, First Reading

Mr Speaker, the terror attacks at the mosques are not the first mass shooting this country has endured. Successive governments have known since the Thorp review of 1997 that our gun laws were too weak... More>>

ALSO:

Abuse In Care Royal Commission: Minister's Confidence 'Has Been Shaken'

Internal Affairs Minister Tracy Martin has refused to express confidence in the leadership of the Royal Commission of Inquiry into Abuse in Care, after it was revealed a convicted child sex offender was involved. More>>

ALSO:

'Equity Index': School Deciles Gone In Two Years

School deciles will be replaced in 2021 or 2022 by an Equity Index that better aligns equity funding to actual levels of socio-economic disadvantage in our schools, Education Minister Chris Hipkins announced today. More>>

ALSO:

Gordon Campbell: On The RWC, And The Op Burnham Inquiry

Last week’s cross-examination of the military’s former top brass demonstrated in detail that the NZDF had consistently misled its Ministers (and the wider public) for years, over the impact of our military activities in Afghanistan. More>>

Call For Action On Expert Panel Report: Welfare System Needs Urgent Change

If we want New Zealand to be the best place in the world to be a child, the Government needs to increase benefits, remove sanctions, individualise benefits, and fix abatement rates now, says Child Poverty Action Group and ActionStation . More>>

ALSO:

First Data Releases: Mixed External Report On Census Fail Mitigation

The panel endorses the statistical approaches used to mitigate non-response... However, the unprecedented use of alternative government datasets to augment census data raises questions around ethics, social licence, cultural licence, and Māori data sovereignty. More>>

ALSO:

Aitches: Manawatū-Whanganui Region Spelling Corrected

The Manawatu-Wanganui Region will in future be correctly spelt Manawatū-Whanganui Region. The change also means the regional council will be known as the Manawatū-Whanganui Regional Council. Horizons Regional Council is the trading name for the council. More>>

PM In Japan: Jacinda Ardern’s Remarks Following Abe Summit

Today we discussed a wide range of topics. Broadly the themes were: a deeper, high-value trade and investment relationship, greater cooperation in the Pacific; and strengthening our security partnership. More>>

ALSO:

 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

InfoPages News Channels