Video | Agriculture | Confidence | Economy | Energy | Employment | Finance | Media | Property | RBNZ | Science | SOEs | Tax | Technology | Telecoms | Tourism | Transport | Search

 


Work Starts On New Emirates Headquarters


Work Starts On New Emirates Headquarters

Airline's Future Home to Set New Standards in Corporate Offices

Construction has started on a new NZ$275 million headquarters for the Emirates Group, with completion scheduled for mid-2006. Staff will move in progressively over the next year.

The new Group's central office will be located on Airport Road, opposite the present Emirates Engineering Centre, and connected to Dubai International Airport via a tunnel. Its construction will be entirely self-financed by Emirates.

His Highness Sheikh Ahmed bin Saeed Al-Maktoum, Chairman of Emirates, said: "Our new home has been designed to be both engaging and no-nonsense. It will be a statement about core Emirates values such as our constant quest for quality, innovation and a sensible balance of high-tech and user-friendliness.

"It will be a showcase building for the Emirates creativity that pulsates throughout the entire Group. It will break new ground as a corporate central office and will help us demonstrate our dedication to our customers and employees alike."

The main design objective of the new Emirates central office was to offer an even more productive environment to staff and be efficient to visitors. It will be an expression of the Group's success, but more importantly, it will help to convey the company's confidence in Dubai's future and its own.

At 200 metres from end to end, the curved facade of the new building will be more than twice as long as the current headquarters and 100 metres across at its thickest point ? again more than twice the width of the existing central office. It will have two basement levels, ground floor and nine upper floors, providing 700,000 square feet of net office space.

Access at ground level will be via entry lobbies at each end of the building, with lifts and escalators to the first and second floors. A grand hall will soar from the second floor - the Atrium level ? all the way up to the roof. The atrium also will have a bridge at each end leading to multi-level car parks. Several meeting facilities will be accessible from the atrium level, including an auditorium and 30 conference rooms.

Besides the group's management team, the building will house an estimated 3,500-strong staff. They will enjoy a workplace environment designed to alleviate stress and encourage creative thinking. A huge central communal area will offer a host of support facilities that will include dedicated spaces for catering, retail and other services. Laid out and equipped to offer the highest professional office standards to staff, the building is also intended to extend to customers and visitors the trademark welcome-to-Emirates feeling characteristic of the airline's lounges and aircraft.

Parking space for 3,000 vehicles is planned, as well as two bus points and taxi rows. A high-speed monorail station at the back of the building is a possibility at a later stage, connecting it directly with points up to Jebel Ali. A bridge would enable staff arriving by monorail to have direct access to the atrium level.

The new headquarters has become a pressing necessity as a result of Emirates' rapid growth, and was conceived to accommodate the group's expansion plans well into the future.

The Emirates Group's present central office near the Clock Tower in Deira, in central Dubai, was built in 1976. A multi-level car park was added as an extension to the building five years ago.

The Group's rapid growth soon made its original home insufficient for the increasing staffing needs. In the almost 30 years since its construction, the Group's employees became spread over a total of 19 facilities in Dubai - 11 owned buildings and eight leased properties, plus a large number of Dnata travel shops throughout the UAE. The new headquarters will result in greater space management efficiencies as well as considerable annual savings in property utilisation costs.

© Scoop Media

 
 
 
 
 
Business Headlines | Sci-Tech Headlines

 

Sky City : Auckland Convention Centre Cost Jumps By A Fifth

SkyCity Entertainment Group, the casino and hotel operator, is in talks with the government on how to fund the increased cost of as much as $130 million to build an international convention centre in downtown Auckland, with further gambling concessions ruled out. The Auckland-based company has increased its estimate to build the centre to between $470 million and $530 million as the construction boom across the country drives up building costs and design changes add to the bill.
More>>

ALSO:

RMTU: Mediation Between Lyttelton Port And Union Fails

The Rail and Maritime Union (RMTU) has opted to continue its overtime ban indefinitely after mediation with the Lyttelton Port of Christchurch (LPC) failed to progress collective bargaining. More>>

Earlier:

Science Policy: Callaghan, NSC Funding Knocked In Submissions

Callaghan Innovation, which was last year allocated a budget of $566 million over four years to dish out research and development grants, and the National Science Challenges attracted criticism in submissions on the government’s draft national statement of science investment, with science funding largely seen as too fragmented. More>>

ALSO:

Scoop Business: Spark, Voda And Telstra To Lay New Trans-Tasman Cable

Spark New Zealand and Vodafone, New Zealand’s two dominant telecommunications providers, in partnership with Australian provider Telstra, will spend US$70 million building a trans-Tasman submarine cable to bolster broadband traffic between the neighbouring countries and the rest of the world. More>>

ALSO:

More:

Statistics: Current Account Deficit Widens

New Zealand's annual current account deficit was $6.1 billion (2.6 percent of GDP) for the year ended September 2014. This compares with a deficit of $5.8 billion (2.5 percent of GDP) for the year ended June 2014. More>>

ALSO:

Still In The Red: NZ Govt Shunts Out Surplus To 2016

The New Zealand government has pushed out its targeted return to surplus for a year as falling dairy prices and a low inflation environment has kept a lid on its rising tax take, but is still dangling a possible tax cut in 2017, the next election year and promising to try and achieve the surplus pledge on which it campaigned for election in September. More>>

ALSO:

Job Insecurity: Time For Jobs That Count In The Meat Industry

“Meat Workers face it all”, says Graham Cooke, Meat Workers Union National Secretary. “Seasonal work, dangerous jobs, casual and zero hours contracts, and increasing pressure on workers to join non-union individual agreements. More>>

ALSO:

Get More From Scoop

 
 
Standards New Zealand

Standards New Zealand
 
 
 
 
 
 
 
 
Business
Search Scoop  
 
 
Powered by Vodafone
NZ independent news