Video | Agriculture | Confidence | Economy | Energy | Employment | Finance | Media | Property | RBNZ | Science | SOEs | Tax | Technology | Telecoms | Tourism | Transport | Search

 


Rural Broadband now live in Ophir

Rural Broadband now live in Ophir

Mobile coverage and broadband options for some residents in Central Otago just got a whole lot better as Vodafone switched on a newly built cell site at Ophir under the Governments Rural Broadband Initiative (RBI).

The tower, a 25 metre monopole will provide new coverage to over 290 households in the area. The service, with urban comparable pricing, delivers not only mobile coverage, but wireless broadband via a high performance modem, adding a WiFi network into the home. Phone calls can also be made through this service by plugging an existing landline phone directly into the modem, removing the need for a landline connection. Customers can port their existing landline number to this new service.

There is one other RBI site planned to be built in the Central Otago area, and Naseby will be built next year. Vodafone confirms two of the existing sites in the area have already been upgraded to deliver the wireless broadband service –Clyde and Springvale. The others - Tarras, Cromwell, Obelisk, Roxburgh and Ranfurly are scheduled to be completed before 2015.

Vodafone’s Business Development Manager Jake Vargo says the new cell site brings greater options to the community, with households and businesses now having choice in broadband service.

“Switching to wireless broadband can provide a consistent and reliable service to residents It also offers the rural community the opportunity to increase production and monitoring through machine to machine automation,” he said.

An additional benefit of RBI for rural communities is the extension of mobile coverage to include 4,500km of rural New Zealand roads, which until now have been without.

“This is a massive benefit for rural communities in dealing with emergencies, transport logistics, road safety and other real life circumstances that have been hampered by limited coverage,” said Vargo.

Under the five year RBI plan, Vodafone will upgrade 387 existing cell towers and build a further 154 new towers in rural areas all over New Zealand. The government is funding the civil construction costs of these new sites which are designed to accommodate Vodafone equipment and that of other mobile and wireless operators. 23 new sites have been built so far, and an additional 131 have been upgraded.

Customers can find out if this service will be available at their address by checking online at

www.vodafone.co.nz/rural-broadband.

More imagery of example monopole towers is available if required, along with a proposed RBI coverage map of the wider area and a schematic diagram of how wireless broadband works.

ENDS

Notes to editor:

Wireless Broadband will be installed by a Vodafone arranged technician, and installation fees will apply. In the unlikely event your installer determines you may not receive a good experience, the installation will not proceed and you will not be charged.

Vodafone Wireless Broadband Plans and Pricing

Wireless Broadband & Calling 1Wireless Broadband & Calling 2
Cost per month$100$110
Broadband included
each month
5GB10GB

Vodafone Wireless Broadband Calling plans

Wireless Broadband and Calling plans come with a standard per minute calling plan, which includes unlimited local calling and great rates to national and international landlines and mobiles.

National calls are 26c per minute, capped at $2.50 per call (for up to 2 hours).

Calls to New Zealand mobiles are 36c per minute.

A great range of calling add-ons are available, including calls to NZ landlines for $20 a month.

For a full list of add-ons and international rates as well as popular phone line features such as voicemail, visit vodafone.co.nz/rural-broadband.

Standard installation charges for Wireless Broadband

Price on a
24 month term
Price on a
1 month term
What’s included
Standard installation plus modem

$228$698Installation, cabling, connection of main computer and confirmation of connection.

If you’ve selected the Calling option, we’ll transfer one landline number to Vodafone Wireless.

Premium installation plus modem$598$848A special installation may be required if you have a home that doesn’t meet the standard requirements, or is made of glass or brick.

Please see www.vodafone.co.nz for more information and for a full list of our terms and conditions.


© Scoop Media

 
 
 
 
 
Business Headlines | Sci-Tech Headlines

 

Cosmetics & Pollution: Proposal To Ban Microbeads

Cosmetic products containing microbeads will be banned under a proposal announced by the Minister for the Environment today. Marine scientists have been advocating for a ban on the microplastics, which have been found to quickly enter waterways and harm marine life. More>>

ALSO:

NIWA: 2016 New Zealand’s Warmest Year On Record

Annual temperatures were above average (0.51°C to 1.20°C above the annual average) throughout the country, with very few locations observing near average temperatures (within 0.5°C of the annual average) or lower. The year 2016 was the warmest on record for New Zealand, based on NIWA’s seven-station series which begins in 1909. More>>

ALSO:

Farewell 2016: NZ Economy Flies Through 2016's Political Curveballs

Dec. 23 (BusinessDesk) - New Zealand's economy batted away some curly political curveballs of 2016 to end the year on a high note, with its twin planks of a booming construction sector and rampant tourism soon to be joined by a resurgent dairy industry. More>>

ALSO:


NZ Economy: More Growth Than Expected In 3rd Qtr

Dec. 22 (BusinessDesk) - New Zealand's economy grew at a faster pace than expected in the September quarter as a booming construction sector continued to underpin activity, spilling over into related building services, and was bolstered by tourism and transport ... More>>

  • NZ Govt - Solid growth for NZ despite fragile world economy
  • NZ Council of Trade Unions - Government needs to ensure economy raises living standards
  • KiwiRail Goes Deisel: Cans electric trains on partially electrified North Island trunkline

    Dec. 21 (BusinessDesk) – KiwiRail, the state-owned rail and freight operator, said a small fleet of electric trains on New Zealand’s North Island would be phased out over the next two years and replaced with diesel locomotives. More>>

  • KiwiRail - KiwiRail announces fleet decision on North Island line
  • Greens - Ditching electric trains massive step backwards
  • Labour - Bill English turns ‘Think Big’ into ‘Think Backwards’
  • First Union - Train drivers condemn KiwiRail’s return to “dirty diesel”
  • NZ First - KiwiRail Going Backwards for Xmas
  • NIWA: The Year's Top Science Findings

    Since 1972 NIWA has operated a Clean Air Monitoring Station at Baring Head, near Wellington... In June, Baring Head’s carbon dioxide readings officially passed 400 parts per million (ppm), a level last reached more than three million years ago. More>>

    ALSO:

    Get More From Scoop

     
     
     
     
     
     
     
     
    Business
    Search Scoop  
     
     
    Powered by Vodafone
    NZ independent news