Scoop News  
https://www.scoop.co.nz/stories/AK2101/S00056/watercare-water-supply-update-6-january.htm


Watercare Water Supply Update: 6 January

Water supply update for 6 January.

Rainfall:

YesterdayPast 7 days
Hūnua Ranges0mm11mm
Waitākere Ranges0mm19.5mm

Dam storage (in total):n to

Today:67.28%
Yesterday:67.45%
Normal for this time of year:87.65%

Water consumption:

Target for January 2021:461 million litres or less a day (for the rolling 7-day average)
Yesterday’s consumption436 million litres
Yesterday’s 7-day rolling average398 million litres

Home Page | Auckland | Previous Story | Next Story

Copyright (c) Scoop Media