In July 2020, a worker on the City Rail Link project in Auckland’s CBD hammered a piece of reinforcement rod into a former public footpath area. The rod connected with an underground 11kv electrical cable, and smoke started rising from the area around the rod. Power was lost to the surrounding neighbourhood.
The workers involved in the activity stopped work and notified their supervisor immediately. The supervisor then used a piece of timber and his hands to dig the area to confirm the rod had connected with a cable.
While no one was injured, there was a risk of injury or death.
The company involved had previously identified the location of the cable, and had a permit-to-dig system. However, the permit system only considered excavation below ground and not the penetration of the ground without digging. Therefore because the workers were not digging below the ground, they did not use the permit system which would have identified the location of the buried cable.
In addition:
This incident highlights the health and safety risks involved with working near buried power cables and the need to carefully develop permit protocols.
It shows how important it is for businesses to:
More information: Excavation safety