Scoop News  
https://www.scoop.co.nz/stories/BU2103/S00109/increased-supply-pressures-reported-for-home-building-projects-in-auckland.htm


Increased Supply Pressures Reported For Home Building Projects In Auckland

Respondents were asked about their perceptions of COVID-19’s impact on building projects in the December 2020 quarter, Stats NZ said today.

About 6 out of 10 respondents from home building projects in Auckland reported an impact on the availability of materials and/or equipment. This was the most common issue in the December 2020 quarter for these projects and was a slight increase on the September 2020 quarter. An impact in at least one of the five categories available (cashflow, cost, availability of labour, availability of materials and equipment, and on-site productivity) was reported by around 7 out of 10 respondents of home building projects in Auckland.

Visit our website to read these news stories and information release and to download CSV files:
 

Home Page | Business | Previous Story | Next Story

Copyright (c) Scoop Media