Scoop News  
https://www.scoop.co.nz/stories/AK2303/S00406/rock-clearing-work-resumes-at-state-highway-6-dellows-bluff.htm


Rock Clearing Work Resumes At State Highway 6 Dellows Bluff

Murchison residents and regular users of State Highway 6 need to be ready for night-time travel delays with more rock clearing work planned for Dellows Bluff at the end of this month.

Contractors will be removing dangerous rocks and overhangs from the cliff face. This is the area where rock falls that closed the highway in late July last year.

(Image: SH6 rockfall, July 2022)

The intention is to reduce, as much as possible, the risk of more boulders falling onto the highway.

As this involves blasting to remove unstable rocks and material from the cliff face, brief road closures are needed for safety reasons.

Works Schedule:

Waka Kotahi wants to thank residents and road users for their cooperation and patience while this vital maintenance work is done. The work has been timed to minimise disruption as much as possible.

Drivers are also asked to respect road work signs and temporary speed limits. This is for your safety and that of our work crews.

Footage of previous rock blasting work is available for media to use at the link below.

SH6 Dellows Bluff rock blasting 2022

Plan ahead for a safe, enjoyable journey. Keep up to date with:

· Traffic updates: journeys.nzta.govt.nz/traffic

We have a vision of zero deaths and serious injuries on New Zealand roads. Learn more about:

· Road to Zero – our plan to achieve this vision

Home Page | Auckland | Previous Story | Next Story

Copyright (c) Scoop Media