Auckland Harbour Bridge work resumes
Transit New Zealand Auckland Regional Office
12 May 2005
Auckland Harbour Bridge work resumes
Transit New Zealand advises that resurfacing work scheduled for the Auckland Harbour Bridge (AHB) will now run from Sunday 15 May to Thursday 16 June 2005, weather permitting. The closures will operate only at night from 9pm to 5.30am.
During these times the centre four lanes of the bridge will be closed to traffic, which will be able to use the clip-on lanes. The Curran Street on-ramp will also be closed during these times.
The advice to motorists is, where possible, to consider temporarily changing their driving patterns and/or consider other transportation options during the closures.
The work is part of continuing resealing work essential to the upkeep of the AHB. The application of a new polyurethane surface will result in fewer delays due to lower maintenance requirements.
Transit will be reminding drivers of the closures with signage on the motorways and near the bridge. There will also be a free call number kept updated (0800 RESEAL).
ENDS
Gordon Campbell: On Children’s Book Classics - The Moomins
Zero Waste Network Aotearoa: Container Return Scheme Bill Would Double Recycling Rates And Put Money Back In Households
Wellington City Council: Statement From The Wellington Mayoral Forum On Options For Regional Governance Reform
MUNZ: TAIC Report On Kaitaki Incident Gives Shocking Picture Of Decline Of NZ Maritime Infrastructure
Greenpeace: New Climate Report Yet More Reason To Reduce Dairy Herd
Better Public Media: Opposing Plans To Scrap The BSA
Internal Affairs: Citizenship Test For Citizenship By Grant Applicants From Late 2027

