Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Traffic Bulletin: Kaikōura Hop gets underway

TRAFFIC BULLETIN

17 September 2019


Kaikōura Hop gets underway this week, Hāpuku bridge repairs from next week

People travelling between Picton and Christchurch via SH1 will strike more traffic from Wednesday through this weekend as people travel to Kaikōura for the annual Hop car enthusiasts’ event.

Then from next week, repairs at Hāpuku to the bridge will cause up to two hour delays from the very small hours each Tuesday (midnight to 2 am Tuesday), through to mid-December. Work is continuing under the bridge throughout and between weekly bridge lifts.


Travelling to the Kaikōura Hop: Build in extra time
People should be ready for extra traffic on State Highway 1 over the Kaikōura Hop long weekend, starting this Wednesday night 18 September, running through to 22 September.

Traffic will be down to one lane at some sites where the highway rebuild and repair is underway with stop/go or traffic lights in place. The travel time between Christchurch and Picton is still expected to be 5.5 hours but allow plenty of time in case of delays.

Between Clarence and Kaikōura there will be two of these short stops and between Oaro and Kaikōura there will be three.

https://www.kaikourahop.co.nz/


Hāpuku Bridge, SH1, upcoming night closures
Structural repairs will soon be carried out to strengthen Hāpuku Bridge, just north of Kaikōura on State Highway 1.

The work is being done at night when traffic volumes are low to minimise any disruption, and it is not weather dependent.

Overnight bridge lift work will start in the early hours of Tuesday, 24 September, after midnight through to 2 am, for 13 weeks each Tuesday (with the last closure on 17 December). At these times, the road will be fully closed to all traffic bar emergency vehicles for up to two hours.

“We need to make structural repairs to the bridge piles and to do this safely the bridge must be closed for short periods of time while we lift and lower the bridge decks,” says Colin Knaggs, NZ Transport Agency Owner Interface Manager. “The repair works will require jacking up the bridge decks by 10mm so we can work on the bearings underneath.”

To reduce the impact of traffic loading on the bridge, it is currently one-way with a speed limit of 30km/hour. These controls will remain in place until the completion of the bridge repairs.

Plan ahead for a safe, enjoyable journey. Keep up to date with:
• Traffic updates: nzta.govt.nz/traffic
• Facebook: facebook.com/NZTAsouthisland
• Twitter Top of the South: twitter.com/NZTATotS
• Twitter Canterbury/West Coast: twitter.com/NZTA/CWC
• Journey planner: journeys.nzta.govt.nz
• Phone: 0800 4 HIGHWAYS (0800 44 44 49)


© Scoop Media

 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

Land, Air & Sea: Regions To Benefit From NZ Upgrade


Regional New Zealand will be a hive of activity in the coming months as the New Zealand Upgrade Programme delivers on its promise to modernise our infrastructure, prepare for climate change and help grow our economy. As part of the $12 billion NZ Upgrade Programme announced by the Government last month, $300 million was allocated for capital projects in regional New Zealand.
The first package of regional projects – worth about $190 million – has been announced by Regional Economic Development Minister Shane Jones at an infrastructure seminar today... More>>


 

Gordon Campbell: On The Donations Scandals

By now, it seems crystal clear that something is deeply amiss with the way that New Zealand political parties solicit, receive and report their funding. Evidently, the nominal threshold of $15,000 that requires public disclosure of the donation ... More>>

ALSO:

New Zealand Government: Action On Fuel Market Competition

The Government has released a comprehensive response to ensuring New Zealanders get a fairer deal at the petrol pump. This follows the Commerce Commission fuel market ... More>>

ALSO:



Child Poverty: 18,400 Children Lifted Out Of Poverty

Prime Minister Jacinda Ardern has welcomed new reporting showing the Coalition Government is on track to meet its child poverty targets, with 18,400 children lifted out of poverty as a result of the Families Package... More>>

ALSO:

Gordon Campbell: On Our Unreal Optimism About Coronavirus

At this week’s Chinese New Year celebrations, PM Jacinda Ardern was resolutely upbeat that business with China would soon bounce back to normal – better than ever, even - once the coronavirus epidemic has been brought under control. To Ardern, ... More>>

ALSO:


 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 


 

InfoPages News Channels