Parliament

Gordon Campbell | Parliament TV | Parliament Today | Video | Questions Of the Day | Search

 

Next generation Roads of National Significance


Next generation Roads of National Significance

National is committing to the next generation of Roads of National Significance, National Party Transport Spokesperson Simon Bridges says.

“Our country is growing and we are committed to building world-class infrastructure to encourage that growth to continue,” Mr Bridges says.

“The original seven Roads of National Significance are now either complete or under construction, improving safety and travel times around the country and supporting New Zealand’s economic growth.

”The time has come for the next generation of nation-building projects so today we are announcing that 10 of the country’s most important routes will form the next generation of Roads of National Significance.”

They are:
• Wellsford to Whangarei
• East West Link in Auckland
• Cambridge to Tirau
• Piarere to the foot of the Kaimai Range
• Tauranga to Katikati
• Napier to Hastings
• Manawatu Gorge
• Levin to Sanson
• Christchurch Northern Motorway
• Christchurch to Ashburton

“The new roads are expected to cost around $10.5 billion, on top of the estimated $12 billion invested in the initial seven,” Mr Bridges says.

“Like the first tranche, they will be funded from the National Land Transport Fund and the use of Public-Private Partnerships. The initial funding will come from our record infrastructure investment of $32.5 billion announced in Budget 2017.

“As we have previously said, once the original projects were completed new projects could come on and would be funded by existing revenue sources.

"Strong transport connections are critical for our growing regions and support New Zealand’s economic prosperity, and the Roads of National Significance are an important part of that. They are lead infrastructure projects meaning we are investing now to encourage future economic growth, rather than waiting until the strain on the network becomes a handbrake on progress,” Mr Bridges says.

“The chosen projects are our highest volume roads and they are a sensible and logical extension of the original seven projects. Together they will help provide a strong safe highway network that links our regions effectively with our major cities.

“The completed Roads of National Significance are also our safest, with no road fatalities to date.

“National is committed to building the infrastructure and transport system New Zealand needs to ensure our ongoing economic prosperity is secured,” Mr Bridges says.


Notes to Editors

Attachments:
1. Next generation Roads of National Significance Fact Sheets

2. Next generation Roads of National Significance Q&A

The typical features of a Road of National Significance:

• Continuous four lane State Highways – which means two lanes of traffic flow in each direction
• Separation from opposing traffic flows
• Wide lanes and wide, sealed shoulders
• Safe roadsides clear of obstacles and ditches
• Mainly grade separated intersections – which means they mainly have overbridges, underpasses or well-spaced at grade intersections
• High standard landscaping and environmental controls
• High quality signage

Current Roads of National Significance:

Ara Tūhono – Pūhoi to Wellsford – State Highway 1
Western Ring Route, Auckland – State highways 16, 18 and 20
Victoria Park Tunnel, Auckland – State Highway 1
Waikato Expressway – State Highway 1
Tauranga Eastern Link – State Highway 2
Wellington Northern Corridor – State Highway 1
Christchurch Motorways

© Scoop Media

 
 
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

PSA Report: National Gets An ‘F’ For Health Funding

"Seeing National’s record on health collected in one place is quite sobering - it’s clear that underfunding is having dire consequences on both patients and staff, who are having to do more than ever with less," says Glenn Barclay, PSA national secretary.

"The fact that 58,000 people were referred to specialists last year but didn’t get the treatment they needed is indicative of the fact that services cannot meet growing demand." More>>

 

Children With Disabilities: Education Crisis Unaddressed

In 2008 IHC lodged its complaint against the on-going failure of New Zealand Governments and the Ministry of Education to ensure that disabled children access a quality education on an equal basis to others in New Zealand schools. More>>

Gordon Campbell: Ten Reasons For Not Voting National

if anyone you know is thinking of voting National in Saturday’s election, there’s still time for an intervention. You owe it to your friends and relations to intercede. Because there’s plenty of evidence on National’s mediocre-to-awful track record over its nine years in power. We can’t afford another three years of drift. More>>

ALSO:

Suffrage Day: PSA National Secretaries Vote For Equal Pay

PSA national secretaries Erin Polaczuk and Glenn Barclay are advance voting for the 2017 election alongside their daughters, with equal pay and fairness in mind on the 124th anniversary of women’s suffrage in New Zealand. More>>

ALSO:

Charge Protests: Dairy Farms Use Same Amount Of Water As 60 Million People

Using Dairy NZ numbers, economist Peter Fraser and agricultural consultant Dr Alison Dewes calculate the water consumption of New Zealand dairy farms is equivalent to the residential use of 60 million people. More>>

ALSO:

Greenpeace: Labour, Greens Commit To Canterbury Democracy

Labour MP Megan Woods is promising to return Canterbury’s regional council, ECan, to a democratically elected council. It follows a mass day-long occupation of the ECan building by local water activists calling for the restoration of democracy and urgent action to save rivers. More>>

Gordon Campbell: On National’s Mickey Mouse Policies On Trade

Supposedly, trade is war by other means, and the rationale for it seems just as empty-headed. Once again, the free trade = good mantra was taken as a patriotic given in this morning’s RNZ interview with Trade Minister Todd McClay. More>>

ALSO:

Taxing Campaign: No Changes From Labour's Working Group In First Term

“We know it is important to get this right, so we will balance the need for certainty and urgency by ensuring that any potential changes will not come into effect until the 2021 tax year. This gives multiple opportunities for public input, and a general election before any new tax would come into effect." More>>

ALSO:

 
 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

Featured InfoPages

Opening the Election
 
 
 
  • PublicAddress
  • Pundit
  • Kiwiblog