Scoop has an Ethical Paywall
Work smarter with a Pro licence Learn More

Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Taramakau Bridge to be closed for safety improvements

Taramakau Bridge to be closed for safety improvements

The Transport Agency has confirmed the timing for next month’s extended closures of the Taramakau road/rail Bridge on State Highway 6 near Greymouth, so safety improvement work can be carried out on the entrances to the bridge.

Two 12-hour closures are planned from 8pm Saturday 13 June to 8am Sunday 14 June and then again at the same times, from Saturday 27 June to Sunday 28 June.

The NZ Transport Agency’s Regional Performance Manager Pete Connors says the closures are necessary to enable KiwiRail to install rubber mats on the bridge approaches to improve safety for both motorcyclists and cyclists. Between 2005 and 2014, there were eight serious crashes involving motorcyclists on or near the bridge.

“The work is costing an estimated $360,000, requires the removal of a 50 metre section of track at each end of the bridge and replacing it with new track and concrete sleepers. To do this a large amount of material has to be removed at the ends of the bridge and the foundations for the track reinstated.”

The installation will be carried out by a team of Kiwirail staff who have experience with this safety system, with the job being overseen by a representative of the European manufacturer of the matting. It’s the first time this particular type of matting has been used on a road bridge in New Zealand.

Mr Connors says the closures have been scheduled to minimise disruptions for road users and any clashes with any major events in the region. A detour route using local roads will be available via Jacksons, Stillwater and Moana and adds about 90 minutes to journey times.

Advertisement - scroll to continue reading

Are you getting our free newsletter?

Subscribe to Scoop’s 'The Catch Up' our free weekly newsletter sent to your inbox every Monday with stories from across our network.

“We apologise in advance for any inconvenience these closures will cause motorists, however this safety work is critical and we need a couple of 12-hour windows plus some good weather, to successfully complete this work.”

He says motorists are urged to plan their journey during these closures and allow plenty of extra time for their travel. If the trip isn’t essential during the closures periods, they may want to consider re-scheduling their trip outside of the bridge closure times.

Access across the bridge will be maintained for emergency vehicle during these closures.

The latest information about this work will be available atwww.highwayinfo.govt.nz or on 0800 44 44 49.

ENDS

© Scoop Media

Advertisement - scroll to continue reading
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

 
 
 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

InfoPages News Channels


 
 
 
 

Join Our Free Newsletter

Subscribe to Scoop’s 'The Catch Up' our free weekly newsletter sent to your inbox every Monday with stories from across our network.